The future of regional aviation is electric.

We help airports and airfields prepare for the electrification of aviation.
Opportunities and challenges

Electric flight gives airports a new role – if the infrastructure is ready in time.

Electric aircraft make short regional connections and flight training quieter, cleaner and cheaper to operate. Turning that into traffic requires charging infrastructure on the ground – and that comes with long lead times.

Opportunities

Challenges

Our approach

A realistic view of the market and pragmatic steps for your energy and charging infrastructure.

Electric flight starts in training and with small regional aircraft. When and how fast traffic grows is open. Those preparing today plan in scenarios and secure first what takes longest.
1

Develop demand scenarios

Network, routes and resulting charging demand as low, base and high case.
2

Request grid connection early

With a robust power figure. This is the most time-critical step.
3

Build for expansion

A flexible architecture that enables CCS fast charging and the upgrade to megawatt charging (MCS).
4

Grow with demand

Add PV, battery storage and charging points in modules.
Services

From potential analysis to implementation

RAM potential and infrastructure analysis Entry point

How much electric regional air traffic is realistic at your site, and what charging infrastructure follows from it?
Enquire →

Energy and charging concept

Grid connection, PV, battery storage and chargers as one overall concept with sizing and implementation roadmap.
Enquire →

Strategy and target vision

Positioning your site for the electrification of aviation, together with shareholders and partners.
Enquire →

Support for PV, BESS and charging

Site assessment, selection of suitable implementation partners and support through to contract.
Enquire →
Example project

The RAM analysis in six steps

Proven at commercial airports of different sizes. Typical duration four to eight weeks.
01

Introduction

Aircraft programmes, ranges, charging standards
02

Flight movements

Analysis of your current traffic data
03

Potential

Target network of electrically reachable destinations
04

Scenarios

Exemplary flight schedule, low, base and high case
05

Infrastructure

Charging points, grid connection capacity, apron layout
06

Result

Roadmap and recommendations
Your site Rings: range of reference aircraft
Target networkDestinations within realistic range
Connection capacity incl. planning reserve Peak load 0 h6 h12 h18 h24 h
Charging profileCharging power over the day and connection capacity
MCS CCS2 Back-to-back arrangement
Apron layoutStands and charging points
Example from practice: For the general aviation area of an international airport, the analysis produced a target network of 25 destinations, 5 MCS and 6 CCS2 charging points and around 3.7 MW of grid connection capacity.
Your contact

Dr. Stefan Breunig

I know the electrification of aviation from the aircraft side. At Rolls-Royce, I led strategy and product management in the electrification division until 2025. Today I bring this experience to the airport side.
Contact

Let's talk about your site.

In 30 minutes we clarify where you stand and which step makes sense.